Skip to content

Practice · HUB · REV 2026-10-06

BoxTech O2mea services

A service is a chain: brief, survey, design, drawing, specification, supply, installation, test, commissioning, maintenance. A price missing a link is a number without a subject.

What this gate is

Phase one publishes the gates and the pages that answer: theatre design and construction, hall design and construction, conference rooms, acoustics, isolation and treatment, audio and image, seats and stands, cinema, stage, interior, and booths.

Supply, bills of quantities and project management sit on the map for a later phase. They are not written empty so that search results look full.

What is published now

  • Design

    Section, volume, and a success criterion.

  • Construction

    Coordination of loads, openings and isolation with the structure.

  • Systems

    Audio and image measured after installation.

  • Knowledge

    So a device is not bought to repair a room that was never questioned.

When to open this gate

  • A new build

    Before the rake is poured and the air path is fixed.

  • An existing hall

    When the complaint is echo, privacy or view, not only “we want new colours”.

  • Two contradictory bids

    When the box count differs and there is no coverage map.

How to read the subject

  1. 01

    Name the use: speech, music, sport, cinema, or a mix.

  2. 02

    Fix the volume and the existing condition.

  3. 03

    Separate the isolation question from the treatment question.

  4. 04

    Do not accept commissioning without a measurement method.

What this gate does not do

  • One service named full fit-out

    It hides whichever item was never drawn.

  • Starting from the product

    The chair and the screen follow the section, not the reverse.

  • A city in the title

    Without a fact about that city the page is rejected.

Questions designers and owners ask

Are there prices on the site?

No. A price follows a scope, a site and a specification.

Does design include audio?

If audio is part of understanding speech, it has to be named. The theatre page says where it starts and where it is handed to the system page.

What do I prepare before contact?

A plan or dimensions, an approximate count, and what must succeed in the room.

Is maintenance a separate service?

Yes on the map, and its page is not published yet. Good commissioning leaves a report that maintenance can use.

Where do I start?

From the project study, or from a library question if you are still naming the problem.

Technical sources

  • The delivery chain on this page

    The delivery chain on this page

  • ISO 3382-1 and IEC 60268-16

    ISO 3382-1 and IEC 60268-16

  • The local code

    The local code

Last editorial review: 2026-10-06. Review means the text was checked, not that a project was measured.

Turn the question into a brief

A study starts from room volume, use, and existing condition, not from a product name. Fill the brief and copy it.

Project study form