Projects and method · HUB · REV 2026-10-06
Projects and method
A publishable project names the place only with permission, and writes the challenge, the existing condition, the audio decision, the seat, the image, and the measured result. Anything less is a teaching scope, and the title says so.
What this gate is
The study structure: brief, challenge, existing condition, design aim, acoustic strategy, seating strategy, audio, image, lighting, interior, construction, installation, test, commissioning, result.
A photograph without a measurement is advertising. A measurement without a method cannot be compared. That is why this page is not filled with attributed jobs.
What is published now
A speech scope
About 400 seats, view, screen and noise.
A multipurpose scope
Speech, music and rigging loads.
A stand scope
A floor that must clear, telescopic, corrosion.
What publication still needs
Permission, photographs, and a measurement report.
When to open this gate
Before asking for a gallery
So you agree on what counts as evidence.
When a later study is written
When a later study is written
Not to prove a contract
Not to prove a contract
How to read the subject
- 01
Read the scope closest to your problem.
- 02
Notice what is missing: a name, a photograph, a measured figure.
- 03
Do not copy the scope into a quotation.
- 04
Use it to write your own brief.
What this gate does not do
Treating the example as a finished job
The title says reference.
Asking for a client logo
Asking for a client logo
A render as acoustic evidence
A render as acoustic evidence
Client names and photographs attributed to contracts are not published here. A public case study is written only with permission. What follows are scopes that explain the method.
Reference scope: a speech hall of about 400 seats
The question is not the chair count. The section has to show the eye line to the bottom of the screen, the volume has to be discussed with mid-band RT, and the HVAC has to be named as background noise before a loudspeaker is bought. This is a teaching scope, not a named client project.
Reference scope: a theatre between speech and music
One reverberation target will disappoint one of the uses. An honest scope writes two modes, and what changes between them: a curtain, a panel, or nothing, with the compromise accepted. Stage and rigging loads go to the structure, not to a decoration item.
Reference scope: a hall whose floor must be cleared
A telescopic stand is chosen because the floor has a second use, not because the word sounds better. Ask about storage depth, track flatness, who operates the move, and inspection before each opening. Galvanizing is a corrosion subject, not a colour.
Questions designers and owners ask
Where are the photographs?
No attributed photographs in this edition. The drawing on the home page is a diagram labelled as not a project.
Can our project be published?
With written permission, and after a report that names the method.
Why only three scopes?
Why only three scopes?
Does geography matter?
Does geography matter?
What do I read with the method?
What do I read with the method?
Technical sources
- The case-study structure on this page
The case-study structure on this page
- Future measurement reports
Future measurement reports
- Publication consent
Publication consent
Last editorial review: 2026-10-06. Review means the text was checked, not that a project was measured.
Turn the question into a brief
A study starts from room volume, use, and existing condition, not from a product name. Fill the brief and copy it.
Project study form