All articles — page 4
- شاشة المسرح المتنقلة للفعالية
شاشة المسرح المتنقلة للفعالية. A BoxTech planning note, read with the drawing before the model and the count are approved.
- صوت الشاشة وصوت الممثل في العرض الواحد
صوت الشاشة وصوت الممثل في العرض الواحد. A BoxTech planning note, read with the drawing before the model and the count are…
- جدار العرض بدل الشاشة المعلقة
جدار العرض بدل الشاشة المعلقة. A BoxTech planning note, read with the drawing before the model and the count are approved.
- اختبار الصورة من مقعد ذي احتياجات خاصة
اختبار الصورة من مقعد ذي احتياجات خاصة. A BoxTech planning note, read with the drawing before the model and the count are…
- Reflectors over the stage, absorption at the rear
Reflectors over the stage, absorption at the rear in Cairo. Mixing absorption and reflection on the same ceiling kills clarity. A BoxTech…
- Switching an arena from a match to a concert
Switching an arena from a match to a concert in Abu Dhabi. Bowl coverage is not stage coverage. Both are clauses. A…
- A confidence monitor behind the speaker
A confidence monitor behind the speaker in Manama. The small monitor behind the speaker is not the hall screen. A BoxTech specification…
- A conference seat for a four-hour session
A conference seat for a four-hour session in Riyadh. Comfort is measured by session length, not by the hotel photograph. A BoxTech…
- A hall that switches from rows to tables
A hall that switches from rows to tables in Dubai. A fixed seat blocks the change. A seat on a short beam…
- Control-room glass
Control-room glass in Cairo. Angled glass stops the speakers reflecting into the engineer’s face. A BoxTech specification note before price.
- A seat in a room that needs speech clarity
A seat in a room that needs speech clarity in Cairo. Upholstery absorbs speech if it covers every wall as well. A…
- Delay in a long bowl
Delay in a long bowl in Riyadh. Sound that arrives before the picture in the last row is retimed. A BoxTech specification…
- A stand struck after a tournament
A stand struck after a tournament in Cairo. Storage is numbered parts, not one lump. A BoxTech specification note before price.
- Planning a stadium bowl: sector, sun and exit
Why a ground is not dressed in one chair, and how sun, gate and the field line are checked before colour.
- Royal boxes and stadium boxes: a room, not a darker row
The door, the glass, the table and the length of the sitting, and why a hotel interior fails if it cuts the…
- Row pitch and aisle width in a playhouse
Centre to centre, aisle width after the arm, and why the last seat is not squeezed to complete the count.
- The sightline: the basis of theatre design before the chair
How a sightline is drawn from the seated eye to the stage, and why the last row fails if that drawing comes…
- The stage house: opening, tower, masking and the line of sight
What is checked in the proscenium and the side masking before decor is approved, and how that meets the seat.
- Steel stands: fixed, telescopic, galvanized and demountable
Four types that are not bought with one chair, and what is checked in each before it is fixed.
- Sealing a box door
Sealing a box door in Doha. An open cable hole equals a half-open door. A BoxTech specification note before price.
- A quiet edit room
A quiet edit room in Doha. The long-session chair here is a comfort clause, not a crowd clause. A BoxTech specification note…
- A family suite with room for a chair
A family suite with room for a chair in Abu Dhabi. Space for a wheelchair is drawn before the suite is sold,…
- A fixed steel stand and its live load
A fixed steel stand and its live load in Riyadh. Live load is signed by the project engineer. The seat is signed…
- A rubber break under the stand
A rubber break under the stand in Jeddah. Footfalls travel into the room under the stand if the steel is not broken.…